table of contents

  • abbreviations and acronyms…v
  • 1.0 introduction…1
  • 1.1 background…1
  • 1.2 design objective…2
  • 1.2.1 intercept plume migration…2
  • 1.2.2 minimize community disruption…2
  • 1.2.3 agency and water purveyor requirements…2
  • 2.0 pipeline design…3
  • 2.1 water transmission pipeline alignment…3
  • 2.1.1 selected route…3
  • 2.1.2 utility impact…3
  • 2.2 pipeline sizing…3
  • 2.3 flood control channel crossing alternative methods…4
  • 2.4 moose lodge site drainage improvements…4
  • 2.5 connection at treatment system…5
  • 2.6 backwash pipeline…5
  • 2.7 well waste lines…5
  • 2.8 regulatory agency requirements…5
  • 3.0 pipeline construction…6
  • 3.1 trenching…6
  • 3.2 backfilling and compaction…6
  • 3.3 paving…6
  • 3.4 temporary controls…7
  • 3.5 testing…7
  • 4.0 technical specifications…9
  • 4.1 material specification…9
  • 4.2 installation specification…9
  • 5.0 detailed drawings…11
  • 5.1 pipeline drawing list…11
  • 5.2 moose lodge grading plan…11
  • 6.0 construction cost estimate…12