1 TITLE PAGE…1-1
2 TABLE OF CONTENTS…2-1
3 SUMMARY…3-1
3.1 BACKGROUND…3-1
3.2 ESTIMATE OF RESOURCES…3-1
3.3 ESTIMATE OF RESERVES…3-3
4 INTRODUCTION AND TERMS OF REFERENCE…4-1
5 RELIANCE ON OTHER EXPERTS…5-1
6 PROPERTY DESCRIPTION AND LOCATION…6-1
7 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND
PHYSIOGRAPHY…7-1
8 HISTORY…8-1
9 GEOLOGICAL SETTING…9-1
9.1 REGIONAL STRATIGRAPHY AND GEOLOGIC SETTING…9-1
9.2 COAL OCCURRENCES…9-1
9.3 STRUCTURAL GEOLOGY…9-2
9.3.1 Sunrise
Field…9-2
9.3.2 Sunset
Field…9-2
10 DEPOSIT TYPES…10-1
11 MINERALIZATION…11-1
12 EXPLORATION…12-1
13 DRILLING…13-1
14 SAMPLING METHOD AND APPROACH…14-1
15 SAMPLE PREPARATION, ANALYSES AND SECURITY…15-1
15.1 CORE DRILLING SAMPLES…15-1
15.2 REVERSE CIRCULATION SAMPLES…15-2
16 DATA VERIFICATION…16-1
17 ADJACENT PROPERTIES…17-1
18 MINERAL PROCESSING AND METALLURGICAL TESTING…18-1
18.1 REGIONAL QUALITY CHARACTERISTICS…18-1
18.2 COAL QUALITY…18-2
19 MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES…19-1
19.1 APPROACH…19-1
19.2 COAL RESOURCE ESTIMATION…19-1
19.3 COAL RESERVE ESTIMATION…19-2
20 OTHER RELEVANT DATA AND INFORMATION…20-1
21 INTERPRETATION AND CONCLUSIONS…21-1
22 RECOMMENDATIONS…22-1
23 REFERENCES…23-1
24 DATE…24-1
25 ADDITIONAL REQUIREMENTS FOR TECHNICAL REPORTS ON DEVELOPMENT
PROPERTIES AND PRODUCTION PROPERTIES…25-1
25.1 MINING OPERATIONS…25-1
25.1.1 Mining Sequence and Scheduling…25-3
25.1.2 Mining Equipment…25-5
25.1.3 Mine Facilities and Infrastructure…25-6
25.1.4 Geotechnical Considerations…25-8
25.1.5 Hydrological Analysis…25-8
25.1.6 Water Management…25-10
25.2 RECOVERABILITY…25-10
25.3 MARKETS…25-11
25.3.1 Market Growth…25-11
25.3.2 Thermal Coal Markets…25-11
25.3.3 Metallurgical (Coking) Coal Markets…25-12
25.3.4 Pricing Forecast…25-12
25.4 CONTRACTS…25-14
25.5 ENVIRONMENTAL CONSIDERATIONS…25-14
25.5.1 Regulatory Framework…25-14
25.5.2 Key Issues and Impacts…25-15
25.6 TAXES…25-16
25.7 CAPITAL AND OPERATING COST ESTIMATES…25-17
25.7.1 Operating Costs: Labor…25-18
25.7.2 Operating Costs: Materials & Supplies…25-19
25.7.3 Operating Costs: Other…25-20
25.7.4 Capital Costs…25-21
25.8 ECONOMIC ANALYSIS…25-23
25.8.1 Sensitivity Analysis…25-24
25.9 PAYBACK PERIOD…25-26
25.10 LIFE OF MINE…25-26
26 ILLUSTRATIONS…26-1
LIST OF TABLES
3.1 Updated In-Place Coal Resources Summary*…3-3
3.2 Production Ramp-up Schedule…3-4
3.3 NPV at Various Discount Rates (8Mtpy)…3-4
3.4 Summary of Estimated Reserves Ovoot Tolgoi Mine…3-4
6.1 Mongolian Mineral Exploration License Fees…6-1
6.2 Summary of Remaining Exploration Licenses…6-2
6.3 SGQ Mine License Description…6-2
11.1Ovoot Tolgoi Property Coal Seam Characteristics…11-1
13.1 Historic Coal Exploration Drilling Activity…13-1
18.1 Drill Holes on the Property…18-2
18.2 Summary of In Place Raw Coal Quality for Sunrise Resource Area…18-2
18.3 Summary of In Place Raw Coal Quality for Sunset Resource Area…18-2
19.1 Criteria Used to Define Assurance of Existence for Coals in Complex Geology Type…19-2
19.2 Classification of Resources Geology Type: Complex *…19-2
19.3 Summary of Estimated Reserves Ovoot Tolgoi Mine…19-3
22.1 Summary of Additional Detailed Studies…22-1
25.1 Production Ramp-up Schedule…25-1
25.2 Life of Mine Summary Quantities…25-4
25.3 Major Equipment Productivities…25-6
25.4 Staff and Operator Labour Numbers…25-18
25.5 Wages and Salaries Summary…25-19
25.6 Unit Operating Costs for Selected Equipment Items…25-19
25.7 Facilities with Costs…25-21
25.8 Summary of Major Equipment Capital Items…25-22
25.9 NPV at Various Discount Rates (8Mtpy)…25-24
25.10 NPV at Various Discount Rates (8Mtpy, Rail Transport)…25-25
25.11 NPV at Various Discount Rates (8Mtpy, Without VAT Refund)…25-25
25.12 NPV at Various Discount Rates (8Mtpy, + 10% Coal Prices)…25-25
25.13 NPV at Various Discount Rates (8Mtpy, – 10% Coal Prices)…25-26
25.14 NPV at Various Discount Rates (8Mtpy, Delay of One year)…25-26